Reel Tech - Knowledge Base

Second Time's a Sure Thing: Another Pit Bull SR™ Vacuum Reel a Newman, WA Mine Site

Written by ReelTech Editor | 28 July 2026, 10:45:00 pm

In mining, the best proof of a product isn't a spec sheet. It's a repeat order. That's exactly what happened when a client of ours came back for a second 1-1/2" Pit Bull SR™ vacuum reel, this time for another active mine site in Western Australia.

A Proven Reel, Two Years On

Their branch has had a Pit Bull SR™ vacuum reel running on one of their WA mine sites for two years. In that time, it's become a fixture of daily operations relied on heavily enough that, rather than patch together a workaround for a second site, the team went straight back to the reel they already knew worked.

That kind of loyalty isn't won with a sales pitch. It's earned through two years of dust, heat and constant use without the reel becoming the problem.

A Second 1-1/2" Vacuum Reel

With the first reel proving its worth, they placed an order for a second 1-1/2" vacuum reel, destined for another Western Australian mine site. The goal was simple: replicate the productivity, safety and usability gains the first reel had already delivered, this time across two sites instead of one.

Why Pit Bull SR™ with Ezi-Deploy™

The Pit Bull SR™ range was the obvious choice again, largely thanks to its standard-fit Ezi-Deploy™ automatic clutch system. For vacuum hose handling in particular, Ezi-Deploy™ removes the heavy drag-out force that normally comes with paying out vacuum hose, letting operators pull and go with minimal effort.

That translates into three concrete gains on site:

  • Productivity less time and effort spent wrestling hose off the reel means faster setup and pack-down between jobs.
  • Safety a low-force, drag-free payout reduces the strain and sprain injuries that come from manual hose handling, a known risk area on mine sites.
  • Usability built on our direct-drive Safe-R-Reel™ gearbox, the reel delivers controlled rewind speeds, so operators get consistent, predictable hose control every time, not just when the reel is new.

For a crew already familiar with how the first reel performs, ordering the same platform again meant no retraining, no second-guessing just more of what was already working.

One Week, Order to Site

Mine sites don't run on relaxed timelines, and equipment orders need to keep pace. From the moment the order was placed, Reel Tech had the new 1-1/2" Pit Bull SR™ vacuum reel built and shipped out to the Western Australian mine site within a week.

For operations teams managing FIFO schedules and tight production windows, that kind of turnaround matters as much as the reel itself. A capable reel that arrives late doesn't solve a productivity problem, it adds to one.

Built for the Pilbara, Backed Nationwide

Western Australia's mining regions and the Pilbara in particular, are some of the harshest operating environments in the country, and also some of the most demanding when it comes to supply reliability. Reel Tech's Pit Bull SR™ family was engineered specifically for this kind of duty: heavy-gauge construction, hot-dip galvanised options, and a gearbox-free direct-drive design that holds up to the dust, heat and constant cycling of a working mine site.

Need a Vacuum Reel That Performs On Day One and Day 700?

If your site is relying on manual handling for vacuum or suction hose, or if your current reel isn't holding up, the Pit Bull SR™ range with Ezi-Deploy™ is built to handle the load, every shift, for years.

Explore the Pit Bull SR™ range → See our full Mining Hose Reels lineup →

Have a tight turnaround or a multi-site rollout to plan? Get in touch with the Reel Tech team to talk through your hose reel requirements.